DSC 0201 - Tethys Energy

Redmoor Academy export limiter installation

JasonLatest Leave a Comment

We installed a Sibert Solar export limitation device at Redmoor Academy so that the solar PV arrays do not export more than 49kW of power to the grid. Monitoring and control is achieved through CT clamps and a solarlog device which communicates with the Solax inverters.

DSC 0190 - Tethys Energy

Solar farm rewire

JasonLatest Leave a Comment

We provided site management services to Encome for the dc electrical rewire of a 5MW site near Plymouth in Devon. The rewire took 4 weeks with 13 electricians and site operatives all co-ordinated on a day to day basis by Tethys Energy to deliver the project on time for the client. In all over 100km of dc cable was replaced.  

DSC 0088 - Tethys Energy

PV panel removal

JasonLatest Leave a Comment

Tethys Energy removed 16 x Solar PV panels for our client near Swindon so that they could replace the felt. After the roof was finished the PV panels were replaced and recomissioned.

WP 20160315 008 - Tethys Energy

Export limitation installed at Booker Park school

JasonLatest Leave a Comment

Tethys Energy Ltd installed and commissioned an export limitation device on a 30kWp solar PV system at Booker Park School in Aylesbury. The device will limit export from the site to just 5kVA by essentially turning down the output from the inverter. Export limitation devices are typically requested to be installed by the DNO when they calculate that the unlimited …