NEWS

October 26 2017

PV cleaning in Buckinghamshire

Posted by in Latest with No Comments

A clean of the PV modules and a full system check on a domestic property in Flackwell Heath, Buckinghamshire.

October 18 2017

Installation services

Posted by in Latest with No Comments

This week we have been providing installation services to Energy My Way Oxford including this installation of a 9 module array on the ‘GSE in roof’ mounting system.

September 25 2017

PV cleaning

Posted by in Latest with No Comments

A domestic property in Haddenham, Oxfordshire had some rather dirty looking PV modules. That was until Tethys Energy came along and gave them a thorough clean with our waterfed brush and pole...

September 25 2017

Export limiter installed at a school in Aylesbury

Posted by in Latest with No Comments

A Sibert Instruments export limiter was fitted to a 20kWp PV array to Stocklake Community School to limit the export to 11.04kW. The system processing is handled by a SolarLog device which also provides...

September 25 2017

Repair and maintenence

Posted by in Latest with No Comments

Solar PV clean, optimiser replacement, Schueten junction box repair and pigeon mesh installed on a domestic property near Kettering.

July 27 2017

Pest mesh installed on domestic PV system in Windsor

Posted by in Latest with No Comments

A domestic PV system in Windsor installed by another company had become home to several pigeons. After the pigeons were removed, we installed a wire mesh to prevent their return.

July 18 2017

Biddenham School export limitation

Posted by in Latest with No Comments

Another successful installation of a limitation device. This system was fitted at Biddenham School for @NZBuildings to limit PV export.

May 8 2017

Redmoor Academy export limiter installation

Posted by in Latest with No Comments

We installed a Sibert Solar export limitation device at Redmoor Academy so that the solar PV arrays do not export more than 49kW of power to the grid. Monitoring and control is achieved...

May 1 2017

Domestic PV in Abingdon

Posted by in Latest with No Comments
Services

4kWp domestic PV system installed in Abingdon, Oxfordshire

April 21 2017

Solar farm rewire

Posted by in Latest with No Comments

We provided site management services to Encome for the dc electrical rewire of a 5MW site near Plymouth in Devon. The rewire took 4 weeks with 13 electricians and site operatives all co-ordinated on...

© 2018 Tethys Energy. All Rights Reserved. Registered in England and Wales No: 8824024

Privacy Policy