Another successful installation of a limitation device. This system was fitted at Biddenham School for @NZBuildings to limit PV export.
Another successful installation of a limitation device. This system was fitted at Biddenham School for @NZBuildings to limit PV export.
We installed a Sibert Solar export limitation device at Redmoor Academy so that the solar PV arrays do not export more than 49kW of power to the grid. Monitoring and control is achieved through CT clamps and a solarlog device which communicates with the Solax inverters.
4kWp domestic PV system installed in Abingdon, Oxfordshire
We provided site management services to Encome for the dc electrical rewire of a 5MW site near Plymouth in Devon. The rewire took 4 weeks with 13 electricians and site operatives all co-ordinated on a day to day basis by Tethys Energy to deliver the project on time for the client. In all over 100km of dc cable was replaced.
Tethys Energy removed 16 x Solar PV panels for our client near Swindon so that they could replace the felt. After the roof was finished the PV panels were replaced and recomissioned.
Tethys Energy becomes approved Tesla subcontractor for the installation of the Powerwall 2 home battery storage system.
Tethys Energy Ltd installed and commissioned an export limitation device on a 30kWp solar PV system at Booker Park School in Aylesbury. The device will limit export from the site to just 5kVA by essentially turning down the output from the inverter. Export limitation devices are typically requested to be installed by the DNO when they calculate that the unlimited …
Tethys Energy provided installation services for 2 Reading Borough Council sites for Caplor Energy.
Tethys Energy completes domestic solar PV system for new build property in Kidlington, Oxfordshire.
Tethys Energy undertook the electrical design, installation and testing of a 50kWp ground mounted single axis tracker system on behalf of Energy My Way North Devon. Working in all weathers our installation team successfully delivered the system which had a requirement from Western Power Networks to limit the export power to 30kWp. To achieve this an export limiting device manufactured …